42, Isanov str., 720017, Bishkek, Kyrgyz Republic

Ministry of Transport and Communications of the Kyrgyz Republic

Project Implementation Unit of the Asian Development Bank

adb-logo

ТЕНДЕРЫ

16 Aug 2022

Request for Expression of Interest AUDIT OF ANNUAL PROJECT FINANCIAL STATEMENTS (APFS)

According to Clause 4.02 (а) of the Financing Agreement between the Government of the Kyrgyz Republic and Asian Development Bank for the CAREC Corridor 1 and 3 Connector Road Project dated December 02, 2016 the Beneficiary shall (i) maintain separate accounts and records for the Project, including separate accounts and records for the Loan and Grant; (ii) prepare annual financial statements for the Project in accordance with accounting principles acceptable to ADB; (iii) have such financial statements audited annually by independent auditors whose qualifications, experience, and terms of reference are acceptable to ADB, in accordance with international standards for auditing or the national equivalent acceptable to ADB; (iv) have the auditors prepare a report (which includes the auditor's opinion on the financial statements, use of the Loan and grant proceeds and compliance with the financial covenants of the Financing Agreement as well as on the use of the procedures for imprest fund(s) and statement of expenditures) and a management letter (which sets out the deficiencies in the internal control of the Project that were identified in the course of the audit, if any); and (v) furnish to ADB, no later than 6 months after the end of each related fiscal year, copies of such audited financial statements, audit report and management letter, all in the English language, and such other information concerning these documents and the audit thereof as ADB shall from time to time reasonably request.
News
16 Aug 2022

REQUEST FOR EXPRESSIONS OF INTEREST

Update of Feasibility Study, Preparation of Detailed Engineering Designs and Bidding Documents as well as Update of Draft Safeguards Documents
for the rehabilitation of 52 kilometers of road sections in Issyk-Kul Oblast
News
16 Aug 2022

Information on contract award for CAREC Corridors 1 and 3 Connector Road Project — Section 2B Epkin – Dyikan (Bashkuugandy) (km 89.5 - km 159.2)

The Ministry of transport and roads of the Kyrgyz Republic has selected a contractor for road construction and rehabilitation works under the CAREC Corridors 1 and 3 Connector Road Project - Section 2B Epkin - Dyikan (Bashkuugandy) (km 89.5 - km 159.2).
News
16 Aug 2022

Selection of Road Engineer for Road Sector Management Reforming Group

REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES)
Kyrgyz Republic:
CAREC Corridors 1&3 Connector Road Project
Loan 3432 / Grant 0496

Assignment Title: Road Engineer 
Reference No. (as per Procurement Plan): CAREC 1&3/CS-IC-15-2018
The Government of the Kyrgyz Republic received financing from the Asian Development Bank towards the cost of the CAREC corridors CAREC1&CAREC3 and intends to apply part of the proceeds for consulting services.
Investment Projects Implementation Group of the Ministry of Transport and Roads of the Kyrgyz Republic needs national road engineer for reforming management road sector group.
News
16 Aug 2022

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES)

REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES)
Country: Kyrgyz Republic Project: First Phase of the Central Asia Road Links Program (CARs-1) Credit No. : 5340-KG, Grant No.: H9340-KG
Assignment Title: 1) a Contract Administration Specialist, 2) a Road Engineer (with procurement background), and 3) Environmental Safeguard Specialist (with experience in Disaster Risk Management)
Reference No. (as per Procurement Plan): CARs/CS-IC-06, CARs/CS-IC-07 и CARs/CS-IC-12
News
16 Aug 2022

Invitation for Bids. Rehabilitation Works and 5-years of Performance-Based Maintenance Services.

Date:
21 November 2018
Loan No.
and Title:

CAREC 1 and 3 Connector Road Project, Phase 2 - Additional Financing
Contract No. and Title:
CAREC/C1&3/ICB/CW2: Rehabilitation Works with 5-years of Performance-Based Maintenance Services.
The number and identification of lots comprising this ICB is:
 LOT 1 - Section 1 Balykchy - Kochkor Road (km 0+000 - km 43+000)
 LOT 2 - Section 2A Kochkor - Epkin Road (km 62+400 -km 89+500)
Deadline for Submission of Bids:
23 January 2019, 16:00 hours [local time].
News
16 Aug 2022

Request for Expressions of Interest CAREC Corridor 1 and 3 Connector Road Project, Phase 2 – Additional Financing Consulting services for Construction Supervision


The Government of the Kyrgyz Republic has applied for a loan from the Asian Development Bank (ADB) and intends to apply part of the proceeds of this loan under CAREC Corridor 1 and 3 Connector Road Project, Phase 2 - Additional Financing for the consulting services for Construction Supervision of rehabilitation a crucial connector road which connect two major CAREC regional corridors, part of the North-South Alternate Corridor Rehabilitation road, incorporating specific features for road safety and climate change adaptation.
News
16 Aug 2022

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES)

REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES)

 

Country: Kyrgyz Republic
Project: First Phase of the Central Asia Road Links Program (CARs-1)
Credit No. : 5340-KG, Grant No.: H9340-KG
Assignment Title: WB IPIG Director
Reference No. (as per Procurement Plan): CARs/CS-IC-14

News