42, Isanov str., 720017, Bishkek, Kyrgyz Republic

Ministry of Transport and Communications of the Kyrgyz Republic

Project Implementation Unit of the Asian Development Bank

adb-logo

Award of Contract - Loan 3730/ Grant 0621 - KGZ: CAREC Corridors 1 and 3 Connector Road Project, Phase 2 - Additional Financing (ADB). Engineering and Construction Supervision

Loan 3730/ Grant 0621 - KGZ: CAREC Corridors 1 and 3Connector Road Project, Phase 2 - Additional Financing (ADB). Engineering and Construction Supervision - Award of Contract.

The Ministry of Transport and Roads of the Kyrgyz Republic completed the consultant selection process for Rehabilitation of CAREC Corridors 1 and 3 Connector Road including a 5-year performance-based contract - Lot 1 Section 1 Balykchy - Kochkor (km 0 - km 43) and Lot 2 Section 2A Kochkor - Epkin (km 62+400 - km 88+500).

 

 

Names of the shortlisted consultants who submitted proposals:

Name of the Consultant

Submission of proposal

Yes/No

1.

JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC, South Korea

Yes

2.

Roughton International Ltd in association with ОсОО RAM Engineering Associates, United Kingdom

Yes

 

3.

Tera International Group, Inc., USA.

No

4.

JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants, Japan

Yes

5.

ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC., Turkey

Yes

6.

JV between IRD Engineering S.R.L. and ООО Rhythm Plus, Italy

Yes

 

 

Scores of their technical proposals.

No.

Наименование компании

Балл за техническое предложение

1

JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC

784,10

2

Roughton International Ltd in association with ОсОО RAM Engineering Associates

796,15

3

JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants

806,15

4

ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC.

797,10

5

JV between IRD Engineering S.R.L. and ООО Rhythm Plus

797,40

 

 

Points of their technical and financial proposals, prices in their financial proposals and overall ranking.

No.

Name

Points

Price of the Financial proposal

Evaluated total price, USD

Overall ranking

Technical

Financial

1

JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC

 

 

784,10

918,00

4 783 505 USD (excluding all indirect local taxes)

4 212 850,00

5

2

JV between IRD Engineering S.R.L. and ООО Rhythm Plus

797,40

940,56

4 682 465 USD (excluding all indirect local taxes)

4 111 810,00

3

3

JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants

806,15

907,10

4 808 955 USD (excluding all indirect local taxes)

4 263 500,00

2

4

Roughton International Ltd in association with ОсОО RAM Engineering Associates

796,15

1 000,00

4 438 055 USD (excluding all indirect local taxes)

3 867 400,00

1

5

ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC.

797,10

925,16

4 750 891 USD (excluding all indirect local taxes)

4 180 236,00

4

               

 

  1. The Name of the winning consultant: Roughton International Ltd in association with ОсОО RAM Engineering Associates.
  2. The contract sum: 4,438,055.00 USD (excluding all indirect local taxes).
  3. Duration of the contract: 84 months.
  4. Summary scope of the contract: Consulting Services for Engineering and Construction Supervision.
16 Aug 2022