Issyk-Kul Ring Road Improvement Project (Barskoon - Karakol Section, 75.2 km), financed by ADB Civil Works Supervision on Section 3 of the Issyk-Kul Ring Road (Barskoon-Karakol)

CONTRACT AWARD INFORMATION

 

 

Background

  • Shortlisting date: 2 October 2024.
  • Shortlisted companies:

Consultant`s name

Country of registration  

1

Renardet S.A. in association with RAM Engineering Associates LLC

Switzerland,

Kyrgyz Republic

2

Roughton International Ltd.

United Kingdom

3

Joint venture between Temelsu International Engineering Services Inc. and Rhythm Plus LLC

Türkiye, Uzbekistan

4

IRD Engineering S.R.L.

Italy

5

Joint venture between Yongma Engineering Co., Ltd. and International Consultants & Technocrats Pvt. Ltd in association with Group of Independent Engineers LLC and Intelligent Solution LLC

Republic of Korea, India,

Kyrgyz Republic,

Georgia

 

6

SMEC International Pty Ltd

Australia

 

  • RFP release date: October 9, 2024.
  • Original proposals submission deadline: November 25, 2024.
  • Extension period for the proposals submission deadline: 7 days.
  • Extended proposals submission deadline: December 2, 2024
  • Technical evaluation approval date: April 19, 2025
  • Financial proposal opening: April 23, 2025.
  • Extension of the validity period of the proposals was requested for two months, i.e. from April 1, 2025 to June 1, 2025 (letter of the Ministry of Transport and Communications of the Kyrgyz Republic dated March 25, 2025) ADB approval for the extension was received on March 18, 2022.

 

By the deadline, bids were received from the following companies:

  1. Roughton International Ltd with sub-consultant ASK Engineering;
  2. Renardet S.A. in association with RAM Engineering Associates LLC;
  3. Joint venture YONGMA ENGINEERING CO., LTD. and Intercontinental Consultants & Technocrats Pvt. Ltd. in association with Group of Independent Engineers LLC and Intelligent Solution LLC;
  4. Joint venture Temelsu International Engineering Services Inc. and Rhythm Plus LLC;
  5. IRD Engineering S.R.L. sub-consultant United Group Teknik Danişmanlik Limited Şirketi.

 

SMEC International Pty Ltd did not submit a proposal.

 

Technical Evaluation Results:

 

Company name  

Technical score  

  1.  

Roughton International Ltd with sub-consultant ASK Engineering

787,35

  1.  

Renardet S.A. in association with RAM Engineering Associates LLC

800,39

  1.  

Joint venture YONGMA ENGINEERING CO., LTD. and Intercontinental Consultants & Technocrats Pvt. Ltd. in association with Group of Independent Engineers LLC and Intelligent Solution LLC

815,03

  1.  

Joint venture Temelsu International Engineering Services Inc. and Rhythm Plus LLC

764,44

  1.  

IRD Engineering S.R.L. sub-consultant United Group Teknik Danişmanlik Limited Şirketi

882,13

 

The assessment resulted in the following ranking:

 

Consulting Entity Консалтинговая компания

Technical Evaluation Техническая оценка

Financial Evaluation

Финансовая оценка

Combined Score

Комбинированный балл

Final Ranking

Итоговый рейтинг

Technical Score

Технический балл

Technical Points

Технические очки

Rank

Ранг

Evaluated Total Price (ETP)

Оценённая стоимость (ОС)

Financial Score

Финансовый балл

Financial Points

Финансовый очки

Rank\Ранг

   

A

B

 

C

D

E

 

F = B + E

IRD Engineering S.R.L. sub-consultant United Group Teknik Danismanlik Limited Sirketi

882,13

793,92

1

3 793 500,00

910,96

91,10

3

885,01

1

Joint venture Yongma Engineering Co., Ltd. and Intercontinental Consultants & Technocrats Pvt. Ltd. in association with Group of Independent Engineers LLC and Intelligent Solution LLC

815,03

733,53

2

3 881 269,00

890,36

89,4

5

822,56

2

Renardet S.A. in association with RAM Engineering Associates LLC

800,39

720,35

3

3 458 450,00

999,21

99,92

2

820,27

3

Roughton International Ltd. with sub-consultant ASK Engineering

787,35

708,62

4

3 847 950,00

898,07

89,81

4

798,42

4

Joint venture Temelsu International Engineering Services Inc. and Rhythm Plus LLC

764,44

688,00

5

3 455 725,00

1 000,00

100,00

1

788,00

5

 

 

  1. Name of the selected consultant: IRD Engineering S.R.L. sub-consultant United Group Teknik Danişmanlik Limited Şirketi
  2. Contract price: US$4,278,500.00 (excluding all local taxes), signed on May 29, 2025.
  3. Contract duration: 96 months (36 months for the construction period and 60 months for DNP).
  4. Subject of the contract: Civil Works Supervision on the Issyk-Kul ring road section (Barskoon-Karakol)